Location: Africa
Project Type: Command Center Visualization Integration Project
Project Background
The client, an EPC general contractor, required a fully integrated regional emergency public security command center for a provincial government site. The construction environment featured multi-agency data convergence and 24/7 duty operation. The project demanded reliable continuous operation, complete tender documentation and factory pre-testing before shipment.
Our Solution
JFTC GROUP provided end-to-end system design, hardware matching, factory assembly, pre-integration and FAT testing. We delivered a regional emergency command center integrating a large LED video wall, multi-agency signal access, KVM dispatching, video conference and redundant power, supporting 24/7 emergency response dispatch.
Scope of Delivery:
- Overall system scheme design
- Selection and supply of integrated hardware
- Cabinet assembly, wiring and internal debugging
- Factory Acceptance Test (FAT) & inspection report
- Operation manuals and technical drawings
- On-site technical guidance & after-sales support
Key Project Highlights
- Multi-agency signal access and unified dispatch
- Dual redundant power and signal for 24/7 duty operation
- Video conference link to field response teams
- Complete certification & tender documents for local submission
- One-stop delivery, reducing multi-supplier coordination risk
After-Sales Support
Our engineering team offers remote technical support and optional on-site commissioning guidance. Spare parts supply and regular maintenance consultation are available for the whole lifecycle of the system.