Location: Middle East
Project Type: AI Computing Infrastructure Turnkey Project
Site Environment: extreme high ambient temperature and limited building space
Project Background
The client, an EPC general contractor, required a fully integrated intelligent infrastructure system for this site. The construction environment featured extreme high ambient temperature and limited building space. The project demanded reliable 24/7 continuous operation, complete tender documentation and factory pre-testing before shipment.
Our Solution
JFTC GROUP provided end-to-end system design, hardware matching, factory assembly, pre-integration and FAT testing. We delivered a coordinated system combining multiple product series to satisfy all functional requirements of the project.
Scope of Delivery:
- Overall system scheme design
- Selection and supply of integrated hardware
- Cabinet assembly, wiring and internal debugging
- Factory Acceptance Test (FAT) & inspection report
- Operation manuals and technical drawings
- On-site technical guidance & after-sales support
Key Project Highlights
- Customized adaptation for local harsh site environment
- Unified visualization & central control platform
- Stable operation under fluctuating power supply
- Complete certification & tender documents for local submission
- One-stop delivery, reducing multi-supplier coordination risk
After-Sales Support
Our engineering team offers remote technical support and optional on-site commissioning guidance. Spare parts supply and regular maintenance consultation are available for the whole lifecycle of the system.