Location: North America
Project Type: Smart Park & Building Integration Project
Project Background
The client, a local system integration partner, required a full intelligent system upgrade for a North American commercial office building. The construction environment featured cold winter climate, strict local electrical code and multi-tenant building operation requirements. The project demanded reliable operation, complete tender documentation and factory pre-testing before shipment.
Our Solution
JFTC GROUP provided end-to-end system design, hardware matching, factory assembly, pre-integration and FAT testing. We delivered a code-compliant commercial building intelligent system integrating access control, video surveillance, HVAC building automation, energy monitoring and smart parking management onto one management platform.
Scope of Delivery:
- Overall system scheme design
- Selection and supply of integrated hardware
- Subsystem integration, cabinet wiring and software docking
- Factory Acceptance Test (FAT) & inspection report
- Operation manuals and technical drawings
- On-site technical guidance & after-sales support
Key Project Highlights
- Local electrical code compliance for North American market
- Multi-tenant access & energy management design
- Cold-climate HVAC and building automation integration
- Complete certification & tender documents for local submission
- One-stop delivery, reducing multi-supplier coordination risk
After-Sales Support
Our engineering team offers remote technical support and optional on-site commissioning guidance. Spare parts supply and regular maintenance consultation are available for the whole lifecycle of the system.