Southeast Asia Airport AV & Central Monitoring Command Room

Southeast Asia Airport AV & Central Monitoring Command Room

Location: Southeast Asia
Project Type: Command Center Visualization Integration Project

Project Background

The client, an EPC general contractor, required a fully integrated airport central monitoring command room in a Southeast Asian tropical region. The construction environment featured high humidity, large space, high ambient noise and strict redundant power requirement. The project demanded reliable 24/7 continuous operation, complete tender documentation and factory pre-testing before shipment.

Our Solution

JFTC GROUP provided end-to-end system design, hardware matching, factory assembly, pre-integration and FAT testing. We delivered an airport central monitoring command room integrating large-format LED video wall, noise-isolated audio system, matrix switching, KVM dispatching and redundant power architecture, supporting 24/7 airport operation monitoring and dispatch.

Scope of Delivery:

  • Overall system scheme design
  • Selection and supply of integrated hardware
  • Video wall, audio and console system assembly & debugging
  • Factory Acceptance Test (FAT) & inspection report
  • Operation manuals and technical drawings
  • On-site technical guidance & after-sales support

Key Project Highlights

  • Humidity-hardened design for tropical airport environment
  • Noise-isolated audio for high ambient noise
  • Dual redundant power for 24/7 airport operation
  • Complete certification & tender documents for local submission
  • One-stop delivery, reducing multi-supplier coordination risk

After-Sales Support

Our engineering team offers remote technical support and optional on-site commissioning guidance. Spare parts supply and regular maintenance consultation are available for the whole lifecycle of the system.

Want a similar solution for your project?

Request Project Proposal →
💬
Request Quotation WhatsApp