Location: Southeast Asia
Project Type: AI Computing Infrastructure Turnkey Project
Project Background
The client, an EPC general contractor, required a fully integrated GPU training data center for a tropical climate site. The construction environment featured high humidity, monsoon season power fluctuation and tropical temperature. The project demanded reliable 24/7 continuous operation, complete tender documentation and factory pre-testing before shipment.
Our Solution
JFTC GROUP provided end-to-end system design, hardware matching, factory assembly, pre-integration and FAT testing. We delivered a humidity-hardened modular GPU training cluster integrating sealed precision cooling, surge-protected UPS and dehumidification, designed for continuous AI training workloads in tropical conditions.
Scope of Delivery:
- Overall system scheme design
- Selection and supply of integrated hardware
- Container assembly, GPU rack wiring and internal debugging
- Factory Acceptance Test (FAT) & inspection report
- Operation manuals and technical drawings
- On-site technical guidance & after-sales support
Key Project Highlights
- Dehumidification & sealed cooling for tropical humidity
- Surge protection for monsoon power fluctuation
- High-density GPU rack design for AI training workload
- Complete certification & tender documents for local submission
- One-stop delivery, reducing multi-supplier coordination risk
After-Sales Support
Our engineering team offers remote technical support and optional on-site commissioning guidance. Spare parts supply and regular maintenance consultation are available for the whole lifecycle of the system.